ALASAADI GROUP

Since 1947

ALASAADI GROUP

Since 1947

a factory with a lot of smoke coming out of it

Committed to superior quality and results

a factory with a lot of smoke coming out of it

Committed to superior quality and results

Al-Asaadi

Group

Since 1974

www.alasaadi.net

Al-Asaadi

Group

Since 1974

www.alasaadi.net
a tall metal tower with a sky background

Al-Asaadi

Since 1974

Group

ALASAADI GROUP

a tall metal tower with a sky background

Al-Asaadi

Since 1974

Group

ALASAADI GROUP

Al-Asaadi

Since 1974

Group

about us

Alasaadi Group is one of the famous companies in Iraq and Turkey, especially in the field of water, wastewater, roads and bridges projects, in addition to electrical projects, all types of buildings, pile drilling, foundation works, workover and well drilling, well surface and specialist on automation solution with oil filed services.

Employs well trained staff of consultants, engineers, technicians and administrators, and has a large number of specialized machines and equipment which enables the company to construct large projects in the field of engineering and construction.

The company has continuous business and cooperative relations with international companies which are specialized in the fields of engineering and construction in order to attain the most modern construction techniques which are used internationally.

Our main objective is to contribute in the reconstruction of our beloved Iraq generally and Kurdistan Region in particular.

Al-Asaadi

Since 1974

Group

about us

Alasaadi Group is one of the famous companies in Iraq and Turkey, especially in the field of water, wastewater, roads and bridges projects, in addition to electrical projects, all types of buildings, pile drilling, foundation works, workover and well drilling, well surface and specialist on automation solution with oil filed services.

Employs well trained staff of consultants, engineers, technicians and administrators, and has a large number of specialized machines and equipment which enables the company to construct large projects in the field of engineering and construction.

The company has continuous business and cooperative relations with international companies which are specialized in the fields of engineering and construction in order to attain the most modern construction techniques which are used internationally.

Our main objective is to contribute in the reconstruction of our beloved Iraq generally and Kurdistan Region in particular.

factories with smoke under cloudy sky

Company history

Alasaadi Group is part of deeply rooted companies in the construction industry for more than five decades.

1974, the first factory for manufacturing marble and mosaic tiles named Galala opened in Erbil, and was the first industrial factory in northern Iraq.

1980 Galala for General Contracting Company was found and became been a country pioneer in the field of construction.

1990 Galala Group became one of the largest industrial group of companies in Iraq and products satisfied the need of the Iraqi market and the rest was exported to the Gulf States.

Mid 1990's Galala Group of Companies branched into several companies in the field of general trading, commercial agencies and contracting.

2007 SWAT Company was founded by the owners of Galala, SWAT Company was created to support the Kurdistan oil and gas needs.

2014 Value travel was established.

2016 SWAT Company became an official representative of EMERSON in Kurdistan of Iraq.

2018 SWAT Company became an official representative of Rodelta Pump in Iraq.

2021 Alasaadi A.Åž Turkey was established.

In 2022, SWAT Company, the official representative of Green Chemicals, started.

2022 Alasaadi Iraq was established.

2023 SWAT NORTH trading co. UAE established

2024 Joud factory for adhesive cement industry itd.

2024 Alasaadi pack factory for cement sack industry

2024 Alasaadi for commercial agencies and real estate investment Ltd. established.

factories with smoke under cloudy sky

Company history

Alasaadi Group is part of deeply rooted companies in the construction industry for more than five decades.

1974, the first factory for manufacturing marble and mosaic tiles named Galala opened in Erbil, and was the first industrial factory in northern Iraq.

1980 Galala for General Contracting Company was found and became been a country pioneer in the field of construction.

1990 Galala Group became one of the largest industrial group of companies in Iraq and products satisfied the need of the Iraqi market and the rest was exported to the Gulf States.

Mid 1990's Galala Group of Companies branched into several companies in the field of general trading, commercial agencies and contracting.

2007 SWAT Company was founded by the owners of Galala, SWAT Company was created to support the Kurdistan oil and gas needs.

2014 Value travel was established.

2016 SWAT Company became an official representative of EMERSON in Kurdistan of Iraq.

2018 SWAT Company became an official representative of Rodelta Pump in Iraq.

2021 Alasaadi A.Åž Turkey was established.

In 2022, SWAT Company, the official representative of Green Chemicals, started.

2022 Alasaadi Iraq was established.

2023 SWAT NORTH trading co. UAE established

2024 Joud factory for adhesive cement industry itd.

2024 Alasaadi pack factory for cement sack industry

2024 Alasaadi for commercial agencies and real estate investment Ltd. established.

Al-Asaadi

Since 1974

Group

our services

What We Offer

white and brown factory during day
white and brown factory during day
cement factory
electric
Drilling
construction
a body of water with a dock and cranes in the background
a body of water with a dock and cranes in the background
industries
automatic projects
pumping supply
electric equipment supply
pipe line & stations
chemical

Al-Asaadi

Since 1974

Group

our services

What We Offer

white and brown factory during day
white and brown factory during day
cement factory
electric
Drilling
construction
industries
automatic projects
pumping supply
electric equipment supply
pipe line & stations
chemical
a body of water with a dock and cranes in the background
a body of water with a dock and cranes in the background
a man in a warehouse moving a cart full of boxes

Al-Asaadi

Since 1974

Group

alassadi pack factory

Alasaadi Pack Factory

Introduction

was established in 28 February 2024 with an production line of cement sack with an monthly anual capacity of 5 million sacks and yearly capacity of 60 million sacks to supply Iraq cement sack demand with international Quality and standards.

a man in a warehouse moving a cart full of boxes

Al-Asaadi

Since 1974

Group

alassadi pack factory

Alasaadi Pack Factory

Introduction

was established in 28 February 2024 with an production line of cement sack with an monthly anual capacity of 5 million sacks and yearly capacity of 60 million sacks to supply Iraq cement sack demand with international Quality and standards.

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

a construction site with a crane and construction equipment

Al-Asaadi

Since 1974

Group

our services

Services that we can provide for cement

a construction site with a crane and construction equipment

Al-Asaadi

Since 1974

Group

our services

Services that we can provide for cement

a construction site with a crane and construction equipment

Al-Asaadi

Since 1974

Group

our services

Services that we can provide for cement

a construction site with a crane and construction equipment

Al-Asaadi

Since 1974

Group

our services

Services that we can provide for cement

low angle photography of cranes on top of building

Al-Asaadi

Since 1974

Group

our services

Construction

two men working
two men working
orange excavator
orange excavator
people building structure during daytime
people building structure during daytime
red metal structure with beam
red metal structure with beam
low angle photography of cranes on top of building

Al-Asaadi

Since 1974

Group

our services

Construction

two men working
two men working
orange excavator
orange excavator
people building structure during daytime
people building structure during daytime
red metal structure with beam
red metal structure with beam
aerial view of high-rise buildings

Al-Asaadi

Since 1974

Group

our services

Construction

aerial view of high-rise buildings

Al-Asaadi

Since 1974

Group

our services

Construction

Al-Asaadi

Since 1974

Group

our services

Construction Implemented Projects

INFRASTRUCTURAL PROJECT IN SARCHNAR

02

01

POLICE GUARDS BUILDING SULAIMANIYA GOVERNORATE

IMPORT & TRANSPORT OF 6000 TONS CEMENT FROM TURKEY

03

04

TRANSPORT OF MATERIALS & EQUIPMENT TO HAMREEN FIELD PROJECT 1600 TRUCKS

05

TRANSPORT OF FAW HUGE 1000 TRUCKS STORAGE TANK MATERIALS

TRANSPORT OF 300 TRUCKS OIL EQUIPMENT AND PIPES TO BAI-HASSAN OIL FIELD

06

07

SERVICE BUILDINGS IN KHURMALA PROJECT

08

BUILDING 100 HOUSES IN ASHTI CITY

09

CIVIL & SUPPORT WORKS FOR REHABILITATION OF OIL WELLS

LAYING OIL PIPES (24 INCH) FOR OIL TRANSPORT

10

SUPPLY THE PARTS OF CAT, FG WILSON & TYPE OF OIL TO DNO

11

12

SUPPLY THE PARTS OF FG WILSON

13

WEST WATER TREATMENT IBN FIRNAS COMPLEX BAGHDAD

14

WATER TREATMENT PLANT IBN FIRANS COMPLEX BAGHDAD

15

CONSTRUCTION OF PILE WORK AND DEFOUNDATION IN WATER INTAKE FOR BOTH PROJECT SHATT ALBASRAH AND RUMAILAH POWER PLANT

16

PIPELINE WORK TO CONNECT BETWEEN WATER INTAKE WITH TWO PROJECTS SHATT AL BASRAH AND RUMAILAH POWER PLANT AROUND 54 KM

17

LV & MV ELECTRIC PACKAGE IN IBN FRINS COMPLEX

Al-Asaadi

Since 1974

Group

our services

Construction Implemented Projects

INFRASTRUCTURAL PROJECT IN SARCHNAR

POLICE GUARDS BUILDING SULAIMANIYA GOVERNORATE

IMPORT & TRANSPORT OF 6000 TONS CEMENT FROM TURKEY

TRANSPORT OF MATERIALS & EQUIPMENT TO HAMREEN FIELD PROJECT 1600 TRUCKS

TRANSPORT OF FAW HUGE 1000 TRUCKS STORAGE TANK MATERIALS

TRANSPORT OF 300 TRUCKS OIL EQUIPMENT AND PIPES TO BAI-HASSAN OIL FIELD

SERVICE BUILDINGS IN KHURMALA PROJECT

BUILDING 100 HOUSES IN ASHTI CITY

CIVIL & SUPPORT WORKS FOR REHABILITATION OF OIL WELLS

LAYING OIL PIPES (24 INCH) FOR OIL TRANSPORT

SUPPLY THE PARTS OF CAT, FG WILSON & TYPE OF OIL TO DNO

SUPPLY THE PARTS OF FG WILSON

WEST WATER TREATMENT IBN FIRNAS COMPLEX BAGHDAD

WATER TREATMENT PLANT IBN FIRANS COMPLEX BAGHDAD

CONSTRUCTION OF PILE WORK AND DEFOUNDATION IN WATER INTAKE FOR BOTH PROJECT SHATT ALBASRAH AND RUMAILAH POWER PLANT

PIPELINE WORK TO CONNECT BETWEEN WATER INTAKE WITH TWO PROJECTS SHATT AL BASRAH AND RUMAILAH POWER PLANT AROUND 54 KM

LV & MV ELECTRIC PACKAGE IN IBN FRINS COMPLEX

black metal empty building

Al-Asaadi

Since 1974

Group

black metal empty building

Al-Asaadi

Since 1974

Group

Al-Asaadi

Since 1974

Group

our services

Automation Projects

Design & Implement SCADA System for IPPR & PSAT

01

KAR1501 - PRC - PO - 000 - 00 - 16

DeltaV DCS, ESD and FGS for GTP2

02

04 - 07 - 2017

05

SWAT Co.

SWAT Co.

03

KPS2 DeltaVTM DCS, ESD/SSLS and FGS

08- 08 - 2016

10 - 01 - 2018

14 - 05 - 2017

04

KAR - PRO - GTP2 PO - 611

KAR1702 - PRC - PO - 0012 - 00 - 000 - Rev2

05

05 - 01 - 2018

KAR - FZE - KHUR - 025

KPS2 DeltaVTM DCS, ESD/SSLS and FGS

Contract Title

Contract No.

Contractor

Duration

Project: Atrush Export Pipeline System 2016-2017

08- 08 - 2016

Project: \ GTP2 , KPS2 and drilling works included road and civil works projects 2018-2017

SWAT Co.

SWAT Co.

10 - 05 - 2017

20 - 06 - 2017

KPS2 DeltaVTM DCS, ESD/SSLS and FGS

KAR - FZE - KHUR - 025

SWAT Co.

21 - 06 - 2017

30 - 07 - 2017

KPS2 DeltaVTM DCS, ESD/SSLS and FGS

KAR - FZE - KHUR - 025

SWAT Co.

01 - 08 - 2017

10 - 09 - 2017

Al-Asaadi

Since 1974

Group

our services

Automation Projects

Contract Title

Contract No.

Contractor

Duration

Project: Atrush Export Pipeline System 2016-2017

Design & Implement SCADA System for IPPR & PSAT

KAR1501 - PRC - PO - 000 - 00 - 16

SWAT Co.

1 Day

DeltaV DCS, ESD and FGS for GTP2

KAR - PRO - GTP2 PO - 611

SWAT Co.

1 Year

KPS2 DeltaVTM DCS, ESD/SSLS and FGS

KAR1702 - PRC - PO - 0012 - 00 - 000 - Rev2

SWAT Co.

7 Months

KPS2 DeltaVTM DCS, ESD/SSLS and FGS

KAR - FZE - KHUR - 025

SWAT Co.

1 Month

SWAT Co.

1 Month

KAR - FZE - KHUR - 025

KPS2 DeltaVTM DCS, ESD/SSLS and FGS

KPS2 DeltaVTM DCS, ESD/SSLS and FGS

KAR - FZE - KHUR - 025

SWAT Co.

1 Month

Al-Asaadi

Since 1974

Group

our services

Construction

a train traveling through a forest filled with lots of trees
a train traveling through a forest filled with lots of trees
a large pipe in the middle of a lush green field
a large pipe in the middle of a lush green field
a close-up of a machine
a close-up of a machine
a blue pipe laying on top of a pile of dirt
a blue pipe laying on top of a pile of dirt

Al-Asaadi

Since 1974

Group

our services

Construction

a train traveling through a forest filled with lots of trees
a train traveling through a forest filled with lots of trees
a large pipe in the middle of a lush green field
a large pipe in the middle of a lush green field
a close-up of a machine
a close-up of a machine
a blue pipe laying on top of a pile of dirt
a blue pipe laying on top of a pile of dirt
black metal empty building

Al-Asaadi

Since 1974

Group

our services

PIPE LINE

black metal empty building

Al-Asaadi

Since 1974

Group

our services

PIPE LINE

black metal empty building

Al-Asaadi

Since 1974

Group

our services

PIPE LINE

black metal empty building

Al-Asaadi

Since 1974

Group

our services

PIPE LINE

black metal empty building

Al-Asaadi

Since 1974

Group

our services

PIPE LINE

Al-Asaadi

Since 1974

Group

our services

PIPE LINE

Construction of 24" oil pipe line between Avana and Saralu

01

KARFZE - 2014 - 0024

Supply of Metering skids for KPC (11 Meter Skid)

03

24 - 10 - 2018

07

SWAT Co.

SWAT Co.

04

Supply of Metering skids for KPC (11 Meter Skid)

01 - 09 - 2017

2021

24 - 10 - 2018

05

KAR1801 - PRC - PO - 000 - 00 - 0015 R.A

KAR1801 - PRC - PO - 000 - 00 - 0016

06

2021

KAR - FZE - KHUR - 027

Supply of Metering skids for KPC (11 Meter Skid)

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2014

14 - 10 - 2014

Project: Atrush Export Pipeline System 2016-2017

SWAT Co.

SWAT Co.

18 - 08 - 2018

30 - 09 - 2018

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

03 - 03 - 2018

13 - 04 - 2018

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

01 - 01 - 2018

15 - 02 - 2018

02

Supply different type of valves

KAR1501 - PRC - PO 01 - 00 - 000- & KAR1501 - PRC - PO 09 - 00 - 000-

SWAT Co.

01 - 03 - 2016

10 - 12 - 2016

Project: Metering Skid, Drilling works and \ 2019-2018

08

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

08 - 03 - 2018

18 - 04 - 2018

09

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

15 - 05 - 2018

01 - 07 - 2018

Supply of Metering skids for KPC (11 Meter Skid)

10

KAR - FZE - KHUR - 027

SWAT Co.

03 - 03 - 2018

20 - 04 - 2018

11

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

01 - 12 - 2018

12 - 01 - 2019

12

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

25 - 11 - 2018

30 - 12 - 2018

13

Supply of Metering skids for KPC (11 Meter Skid)

TV - KDN - 18K - 445

SWAT Co.

20 - 03 - 2018

16 - 05 - 2018

14

Supply of Metering skids for KPC (11 Meter Skid)

TR - KDN - 19K - 446

SWAT Co.

09 - 04 - 2018

01 - 07 - 2018

15

Supply of Metering skids for KPC (11 Meter Skid)

TN - KDN - 20K - 447

SWAT Co.

19 - 05 - 2018

17 - 07 - 2018

Supply of Metering skids for KPC (11 Meter Skid)

16

TU - KDN - 21K - 448

SWAT Co.

10 - 08 - 2018

05 - 02 - 2019

Supply of Metering skids for KPC (11 Meter Skid)

17

NH - KDN - 22K - 449

SWAT Co.

06 - 09 - 2018

30 - 10 - 2018

18

Supply of Metering skids for KPC (11 Meter Skid)

NJ - RIG # 17

SWAT Co.

31 - 05 - 2018

On going

19

KAR - FZE - KHUR - 025

Supply of Metering skids for KPC (11 Meter Skid)

SWAT Co.

01 - 03 - 2018

21 - 04 - 2018

20

Supply of Metering skids for KPC (11 Meter Skid)

KAR - 2019 - KHUR - DWI - 03

SWAT Co.

04 - 08 - 2021

07 - 12 - 2021

21

Supply of Metering skids for KPC (11 Meter Skid)

KAR - 2019 - KHUR - DWI - 03

SWAT Co.

08 - 12 - 2021

21 - 04 - 2022

22

Supply of Metering skids for KPC (11 Meter Skid)

KAR - 2019 - KHUR - DWI - 03

SWAT Co.

22 - 04 - 2022

15 - 06 - 2022

Project: GAS JV project ( Galwaya , ASC , SWAT )

23

Pipeline for both power station Shatt Al-Basra and Rumila power station 54 KM ( 1,200mm - 1,000mm , 700mm ) with cabling

KEPPT pipeline

GAZ JV

02 - 02 - 2020

11 - 11 - 2020

Al-Asaadi

Since 1974

Group

our services

PIPE LINE

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2014

Construction of 24" oil pipe line between Avana and Saralu

KARFZE - 2014 - 0024

SWAT Co.

3 Years

Supply different type of valves

KAR1501 - PRC - PO 01 - 00 - 000- & KAR1501 - PRC - PO 09 - 00 - 000-

SWAT Co.

9 Months

Supply of Metering skids for KPC (11 Meter Skid)

KAR1801 - PRC - PO - 000 - 00 - 0015 R.A

SWAT Co.

3 Years

Supply of Metering skids for KPC (11 Meter Skid)

KAR1801 - PRC - PO - 000 - 00 - 0016

SWAT Co.

3 Years

SWAT Co.

1 Month

KAR - FZE - KHUR - 027

Supply of Metering skids for KPC (11 Meter Skid

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

1 Month

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

1 Month

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

1 Month

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

2 Month

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

1 Month

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

1 Month

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

1 Month

Supply of Metering skids for KPC (11 Meter Skid)

TV - KDN - 18K - 445

SWAT Co.

2 Month

Supply of Metering skids for KPC (11 Meter Skid)

TR - KDN - 19K - 446

SWAT Co.

3 Month

Supply of Metering skids for KPC (11 Meter Skid)

TN - KDN - 20K - 447

SWAT Co.

2 Month

Supply of Metering skids for KPC (11 Meter Skid)

TU - KDN - 21K - 448

SWAT Co.

4 Month

Supply of Metering skids for KPC (11 Meter Skid)

NH - KDN - 22K - 449

SWAT Co.

1 Month

Supply of Metering skids for KPC (11 Meter Skid)

NJ - RIG # 17

SWAT Co.

On Going

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 025

SWAT Co.

1 Month

Supply of Metering skids for KPC (11 Meter Skid)

KAR - 2019 - KHUR - DWI - 03

SWAT Co.

4 Month

Supply of Metering skids for KPC (11 Meter Skid)

KAR - 2019 - KHUR - DWI - 03

SWAT Co.

4 Month

Supply of Metering skids for KPC (11 Meter Skid)

KAR - 2019 - KHUR - DWI - 03

SWAT Co.

4 Month

Pipeline for both power station Shatt Al-Basra and Rumila power station 54 KM ( 1,200mm - 1,000mm , 700mm ) with cabling

KEPPT pipeline

GAZ JV

9 Month

Al-Asaadi

Since 1974

Group

our services

PIPE LINE

01

KARFZE - 2014 - 0024

Supply of Metering skids for KPC (11 Meter Skid)

03

24 - 10 - 2018

07

SWAT Co.

SWAT Co.

04

Supply of Metering skids for KPC (11 Meter Skid)

01 - 09 - 2017

2021

24 - 10 - 2018

05

KAR1801 - PRC - PO - 000 - 00 - 0015 R.A

KAR1801 - PRC - PO - 000 - 00 - 0016

06

2021

KAR - FZE - KHUR - 027

Supply of Metering skids for KPC (11 Meter Skid)

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2014

14 - 10 - 2014

Project: Atrush Export Pipeline System 2016-2017

SWAT Co.

SWAT Co.

18 - 08 - 2018

30 - 09 - 2018

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

03 - 03 - 2018

13 - 04 - 2018

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

01 - 01 - 2018

15 - 02 - 2018

02

Supply different type of valves

KAR1501 - PRC - PO 01 - 00 - 000- & KAR1501 - PRC - PO 09 - 00 - 000-

SWAT Co.

01 - 03 - 2016

10 - 12 - 2016

Project: Metering Skid, Drilling works and \ 2019-2018

08

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

08 - 03 - 2018

18 - 04 - 2018

09

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

15 - 05 - 2018

01 - 07 - 2018

Supply of Metering skids for KPC (11 Meter Skid)

10

KAR - FZE - KHUR - 027

SWAT Co.

03 - 03 - 2018

20 - 04 - 2018

11

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

01 - 12 - 2018

12 - 01 - 2019

12

Supply of Metering skids for KPC (11 Meter Skid)

KAR - FZE - KHUR - 027

SWAT Co.

25 - 11 - 2018

30 - 12 - 2018

13

Supply of Metering skids for KPC (11 Meter Skid)

TV - KDN - 18K - 445

SWAT Co.

20 - 03 - 2018

16 - 05 - 2018

14

Supply of Metering skids for KPC (11 Meter Skid)

TR - KDN - 19K - 446

SWAT Co.

09 - 04 - 2018

01 - 07 - 2018

15

Supply of Metering skids for KPC (11 Meter Skid)

TN - KDN - 20K - 447

SWAT Co.

19 - 05 - 2018

17 - 07 - 2018

Supply of Metering skids for KPC (11 Meter Skid)

16

TU - KDN - 21K - 448

SWAT Co.

10 - 08 - 2018

05 - 02 - 2019

Supply of Metering skids for KPC (11 Meter Skid)

17

NH - KDN - 22K - 449

SWAT Co.

06 - 09 - 2018

30 - 10 - 2018

18

Supply of Metering skids for KPC (11 Meter Skid)

NJ - RIG # 17

SWAT Co.

31 - 05 - 2018

On going

19

KAR - FZE - KHUR - 025

Supply of Metering skids for KPC (11 Meter Skid)

SWAT Co.

01 - 03 - 2018

21 - 04 - 2018

20

Supply of Metering skids for KPC (11 Meter Skid)

KAR - 2019 - KHUR - DWI - 03

SWAT Co.

04 - 08 - 2021

07 - 12 - 2021

21

Supply of Metering skids for KPC (11 Meter Skid)

KAR - 2019 - KHUR - DWI - 03

SWAT Co.

08 - 12 - 2021

21 - 04 - 2022

22

Supply of Metering skids for KPC (11 Meter Skid)

KAR - 2019 - KHUR - DWI - 03

SWAT Co.

22 - 04 - 2022

15 - 06 - 2022

Project: GAS JV project ( Galwaya , ASC , SWAT )

23

Pipeline for both power station Shatt Al-Basra and Rumila power station 54 KM ( 1,200mm - 1,000mm , 700mm ) with cabling

KEPPT pipeline

GAZ JV

02 - 02 - 2020

11 - 11 - 2020

Al-Asaadi

Since 1974

Group

our services

EPC

Installation of cold stripping unit - C - at Saralu

01

KARFZE - 2015 0004

WATER INTAKE for both power station Shatt Al-Basra and Rumila power station

03

06- 06 -2020

SWAT Co.

04

DCS system and SCADA for pipeline project

08- 04- 2015

25 -03- 2021

05

KEPPT water intake

KAR2301 - PRC - PO - 000 - 00 - 0020 MAV

Instrument package for all station and main pipeline

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2015

07 - 11 - 2015

Project: GAS JV project ( Galyawa , ASC , SWAT )

SWAT Co.

SWAT Co

2023

KAR2301 - PRC - PO - 000 - 00 - 0017

02

Disassembly of cold stripping unit in Shoraw

KARFZE - 2015 0008

SWAT Co.

05 - 01 - 2015

04 - 05 - 2015

GAS JV

Project: KAR GP ltd. KAR gas pipeline

2023

Al-Asaadi

Since 1974

Group

our services

EPC

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2015

Installation of cold stripping unit - C - at Saralu

KARFZE - 2015 0004

SWAT Co.

7 Months

Disassembly of cold stripping unit in Shoraw

KARFZE - 2015 0008

SWAT Co.

5 Months

WATER INTAKE for both power station Shatt Al-Basra and Rumila power station

KEPPT water intake

GAS JV

9 Months

DCS system and SCADA for pipeline project

KAR2301 - PRC - PO - 000 - 00 - 0020 MAV

SWAT Co.

2023

KAR2301 - PRC - PO - 000 - 00 - 0017

Instrument package for all station and main pipeline

SWAT Co.

2023

Al-Asaadi

Since 1974

Group

our services

ELECTRIC

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2014

Supply of electrical equipment and rehabilitation of electrical installation

KARFZE - 2014 - 0007

SWAT Co.

3 Months

LV and MV electric package

KAR - SWAT - 268

SWAT Co.

2021

Al-Asaadi

Since 1974

Group

our services

EPC

Installation of cold stripping unit - C - at Saralu

01

KARFZE - 2015 0004

WATER INTAKE for both power station Shatt Al-Basra and Rumila power station

03

06- 06 -2020

SWAT Co.

04

DCS system and SCADA for pipeline project

08- 04- 2015

25 -03- 2021

05

KEPPT water intake

KAR2301 - PRC - PO - 000 - 00 - 0020 MAV

Instrument package for all station and main pipeline

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2015

07 - 11 - 2015

Project: GAS JV project ( Galyawa , ASC , SWAT )

SWAT Co.

SWAT Co

2023

KAR2301 - PRC - PO - 000 - 00 - 0017

02

Disassembly of cold stripping unit in Shoraw

KARFZE - 2015 0008

SWAT Co.

05 - 01 - 2015

04 - 05 - 2015

GAS JV

Project: KAR GP ltd. KAR gas pipeline

2023

Al-Asaadi

Since 1974

Group

our services

ELECTRIC

Supply of electrical equipment and rehabilitation of electrical installation

01

KARFZE - 2014 - 0007

LV and MV electric package

02

2021

SWAT Co.

SWAT Co.

27 - 09 - 2014

KAR - SWAT - 268

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2014

26 - 12 - 2014

Project: BN Firnas project KAR Group

Al-Asaadi

Since 1974

Group

our services

ELECTRIC

Supply of electrical equipment and rehabilitation of electrical installation

01

KARFZE - 2014 - 0007

LV and MV electric package

02

2021

SWAT Co.

SWAT Co.

27 - 09 - 2014

KAR - SWAT - 268

Contract Title

Contract No.

Contractor

Duration

Project: Bai Hasan & Avana Dome Oil Field \ 2014

26 - 12 - 2014

Project: BN Firnas project KAR Group

man doing welding on outdoors

MORE PHOTOS OF OUR PROJECTS

man doing welding on outdoors

MORE PHOTOS OF OUR PROJECTS

MORE PHOTOS OF OUR PROJECTS

MORE PHOTOS OF OUR PROJECTS

MORE PHOTOS OF OUR PROJECTS

MORE PHOTOS OF OUR PROJECTS

black metal empty building

Al-Asaadi

Since 1974

Group

MORE PHOTOS OF OUR PROJECTS

black metal empty building

Al-Asaadi

Since 1974

Group

MORE PHOTOS OF OUR PROJECTS

black metal empty building

Al-Asaadi

Since 1974

Group

MORE PHOTOS OF OUR PROJECTS

black metal empty building

Al-Asaadi

Since 1974

Group

MORE PHOTOS OF OUR PROJECTS

black metal empty building

Al-Asaadi

Since 1974

Group

MORE PHOTOS OF OUR PROJECTS

black metal empty building

Al-Asaadi

Since 1974

Group

MORE PHOTOS OF OUR PROJECTS

black metal empty building

Al-Asaadi

Since 1974

Group

MORE PHOTOS OF OUR PROJECTS

black metal empty building

Al-Asaadi

Since 1974

Group

MORE PHOTOS OF OUR PROJECTS

black metal empty building

Al-Asaadi

Since 1974

Group

certificate of registration

black metal empty building

Al-Asaadi

Since 1974

Group

certificate of registration

Al-Asaadi

Since 1974

Group

contact us

contact us

black metal empty building

Al-Asaadi

Since 1974

Group

Contacts:

ALASAADI Company

ADDRESS: Naz City, Building F, Apartment 7 Erbil, Kurdistan Region of Iraq 44001

T +964 (0) 750 445 0515 - +964 (0) 770 445 0515

black metal empty building

Al-Asaadi

Since 1974

Group

Contacts:

ALASAADI Company

ADDRESS: Naz City, Building F, Apartment 7 Erbil, Kurdistan Region of Iraq 44001

T +964 (0) 750 445 0515 - +964 (0) 770 445 0515